Date | Location | Scenes | Equipment | Actors | Props | Mise-en-scene |
5/09/09 | Will’s Garden | Zip line At the pond On the grass Walking through paths | 2 cameras 2 tripods Zip-line invention Camera Chargers | Dan and Helen | Bench 2 Mobile Phones | Statue Flowers Summer Clothes, Sunglasses |
6/09/09 | Consall Gardens | Old Pyramid Under Wedding Tree Walking Down Several Paths On the Bridge | 2 cameras 2 tripods Bottled Water | Dan and Helen | 2 Mobile Phones | Flowers Summer Clothes, Sunglasses |
1/12/09 | Shopping for robots and instruments, Festival Park, S-O-T and Leek town centre | |||||
19/12/09 | Will’s Bedroom | Robot walking around bedroom Girl in bedroom Green-screen | 1 Stills Camera Tripod Green-screen | Kirsty | Robot High heels Fishnet tights lipstick | Typical teenage boys room, modern furniture, tidy with some clutter |
5/01/10-8/01/10 | Editing and post-production | |||||
9/01/10 | Dan’s Bedroom | Dan moping around bedroom Green-screen in photo frame | 1 charged camera Camera Charger 1 Tripod Green Card | Dan | Empty beer cans Photo frame Laptop Magazines Pizza Box | Messy teenagers bedroom, bed unmade, rubbish on the floor, magazines scattered Dark room |
11/01/10 onwards | Editing and post-production, research and creation of ancillary tasks, scripting and producing presentation for analysis |
Monday, 1 February 2010
Production Diary
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment